• Installation of 3 pontoons for the operating vessels of the St Nazaire wind farm
• 32 M length | 50T displacement
• Professional and public access
• Expansion studies of the whole structure
• Replacement of expansion joints
• Installation of various equipment
• Design of the nautical works of the test site
• Follow-up of the construction and installation
• Studies. and follow-up of the platform realization (Client : DESIGN PRO )
• Installation and follow-up during the 12 months of testing
• Equipment of cofferdam (hemispherical bell, cofferdam: external pressure 4 bar)
• 3 water intakes (wagon valve, controlled by motor brain)
• Metal structure for valve chamber and repair workshop (overhead crane, storage area)
• Main river pier with access from a 40-meter public pier (30-meter floating pontoon, accommodating 200-ton boats, 150 passengers)
• secondary river pier with direct access from the quay (36 m floating pontoon, reception of 2000 T boats, 150 passengers)
• Reception of 6 passenger ships simultaneously around the platform of the pier
• Capacity : 300 persons
• Footbridges, duke of Albes and heavy pontoons