• CERENIS
    Nautical and harbour - industrial and structure


  • CERENIS
    Feasibility studies, diagnosis and coordination


  • CERENIS
    Design and monitoring of river and maritime works


  • CERENIS
    Technical assistance for the realization of works and equipment


  • CERENIS
    Project management - design, planning, management


  • CERENIS
    Supervision and coordination of maritime and river works

Outer harbour and pontoons – Port of Saint Nazaire (EDF)

Outer harbour and pontoons – Port of Saint Nazaire (EDF)

Design

Outer harbour and pontoons – Port of Saint Nazaire (EDF) 

• Installation of 3 pontoons for the operating vessels of the St Nazaire wind farm

• 32 M length | 50T displacement

• Professional and public access 

South Salie Wharf – (SIBA) inter-communal union of the arcachon basin (33)

South Salie Wharf – (SIBA) inter-communal union of the arcachon basin (33)

Project management

Wharf : oceanic effluent outfall

• Expansion studies of the whole structure

• Replacement of expansion joints

• Installation of various equipment

 

Testing of tidal turbines – Design Pro Automation

Testing of tidal turbines – Design Pro Automation

Design

Engineering of marine and river works

Design of the nautical works of the test site

Follow-up of the construction and installation

• Studies. and follow-up of the platform realization (Client : DESIGN PRO )

Installation and follow-up during the 12 months of testing

See the submarine video

 



Al Massira dam – North West Morocco (SADE)

Al Massira dam – North West Morocco (SADE)

Design

Studies of hydraulic structures (earthquake calculation)

• Equipment of cofferdam (hemispherical bell, cofferdam: external pressure 4 bar)

• 3 water intakes (wagon valve, controlled by motor brain)

• Metal structure for valve chamber and repair workshop (overhead crane, storage area)

 

Community of municipalities of Grand Cubzaguais

Community of municipalities of Grand Cubzaguais

Project management

Project in historical site and co-activities on the water level

• Main river pier with access from a 40-meter public pier (30-meter floating pontoon, accommodating 200-ton boats, 150 passengers)

• secondary river pier with direct access from the quay (36 m floating pontoon, reception of 2000 T boats, 150 passengers)

 

City of Lège Cap-Ferret Bélisaire Pier

City of Lège Cap-Ferret Bélisaire Pier

Project management

Replacement and extension of the pier

• Reception of 6 passenger ships simultaneously around the platform of the pier

• Capacity : 300 persons

• Footbridges, duke of Albes and heavy pontoons